Construction automation
Automate Subcontractor Coordination for Construction
Keep subs scheduled, confirmed, and covered by current paperwork so trades arrive in sequence and sites stop going idle.
Why it pays
Improve schedule reliability without living on the phone
One trade runs long and the whole sequence behind it needs to move, which today means an afternoon of calls and texts. Confirmations live in one superintendent's head, while insurance certificates and lien waivers sit in a folder nobody checks until a draw. A sub who never confirmed becomes tomorrow's idle site and a week of schedule slip.
The build
What the finished system does
01
Sync the schedule
When the master schedule shifts, affected subs are notified with new dates and scope automatically.
02
Confirm the crews
Each sub confirms by text, and silence past your cutoff raises a flag instead of a surprise.
03
Check the paperwork
Insurance certificates and lien waivers are tracked, chased before expiry, and verified before crews mobilize.
04
Escalate the gaps
No-shows, declines, and missing documents route to your superintendent with options, and every outcome is logged.
How it lands
From sore spot to steady state
- 01
We map how your schedule, confirmations, and sub paperwork actually move today, exceptions included.
- 02
We baseline idle site days and confirmation rates, then set a first-release target with you.
- 03
We build the coordination flow and test it on a live project with your superintendent reviewing.
- 04
We launch with your core trades first, then bring in the rest and keep tuning.
Wired in, not bolted on
Built around the tools you already run
Your existing software stays. We plug into it, set the limits of what runs unattended, keep a record of what the system did, and make sure a person sees anything strange.
- Construction project management
- Estimating and takeoff
- Accounting with job costing
- Phone and SMS
Questions
The questions we hear first
Which parts of sub coordination can be automated?
The chasing. Schedule notices, confirmation requests, certificate and waiver tracking, and reminders all run on their own. Resequencing trades after a slip and deciding how to handle a no-show stay with your superintendent.
Our subs live in text messages. Does this still work?
Yes. Texting is usually the channel that works, so the automation runs over SMS your subs already answer. The difference is that every confirmation and silence is tracked against the schedule instead of scrolling away.
How do we measure fewer coordination problems?
With a baseline. Before launch we count idle site days, late starts, and how often paperwork holds up a mobilization. The same counts afterward, logged automatically, show whether the schedule is actually holding.